Last updated: October 2026.
Knocking two rooms into one is one of the most popular changes in Irish homes, usually to create an open-plan kitchen, dining and living space. When the wall in the way is structural, removing a load-bearing wall is a job that needs an engineer’s design, a steel or timber beam, temporary support while the wall comes out and the right paperwork at the end.
This guide explains how to tell whether a wall is load-bearing, what the engineer does, which beam options are available, how the work is carried out safely, what it typically costs in Ireland and what you need to keep for when you sell. For the wider renovation budget, see how much it costs to renovate a house in Dublin.
How to Tell If a Wall Is Load-Bearing
A load-bearing wall carries weight from above, such as floor joists, another wall, the roof or a chimney, down to the foundations. A partition wall only divides space. Signs that a wall may be load-bearing include:
- Joist direction: if the floor or ceiling joists run across the wall and rest on it, rather than running parallel to it, the wall is probably carrying them.
- Walls stacked above: a wall directly above on the next floor often bears down on the one below.
- Construction: in many Irish homes built from the 1950s onwards, internal walls on the ground floor are solid blockwork, and the central “spine” wall usually supports the first floor. A hollow-sounding stud wall is more often a partition, but not always.
- Chimney breasts: walls containing or supporting chimney breasts carry significant loads.
- Original drawings: planning or construction drawings for the house, if you can find them, can show the structure.
None of these is conclusive. Timber stud walls can be load-bearing, and solid walls can be non-structural. The only safe answer comes from a structural engineer who has inspected the house, often after lifting a floorboard or opening a ceiling to see how the joists bear.
Why You Need a Structural Engineer
For any load-bearing wall, a structural engineer should be appointed before work starts. The engineer will:
- confirm what the wall is carrying and trace the load paths through the house;
- design and specify the beam, its size, grade and bearing length;
- specify padstones or posts at each end, and check that the walls and foundations below can take the new concentrated loads;
- advise on temporary support while the wall is removed;
- inspect the work on site and provide an opinion or certificate of compliance with the Building Regulations once the work is complete.
The engineer’s calculations and certificate are the documents a buyer’s solicitor will ask for when you sell. Structural alterations without them can delay or complicate a sale, and fixing them retrospectively usually means opening up finished ceilings.
Beam Options: Steel, Timber and Where It Sits
Steel beams (RSJ or universal beam)
Steel is the most common choice in Irish homes. It carries heavy loads over long spans with a relatively shallow beam. The beam is usually lifted in by hand or with simple equipment, so it is sized and cut before delivery.
Engineered timber (glulam or LVL)
Engineered timber beams are lighter and easier to handle and fix to, and can suit shorter spans or lighter loads. They are usually deeper than a steel beam for the same job.
Downstand or flush
- Downstand beam: the beam sits below the ceiling and is boxed in, leaving a visible bulkhead across the room. This is simpler and cheaper.
- Flush beam: the beam sits up within the ceiling depth so the ceiling runs through unbroken. This looks cleaner, but the joists then have to be cut and re-hung on the beam with hangers, which adds time and cost and may not always be possible.
Fire protection
A beam supporting the floor above must have the fire resistance required by Part B of the Building Regulations. Steel is usually encased in fire-rated plasterboard or coated in intumescent paint, as specified by the engineer or designer.
How the Work Is Done Safely
- Survey and design. The engineer inspects the house and produces the beam design and temporary works method.
- Check for asbestos. According to the Health and Safety Authority, any building built or refurbished before 2000 may contain asbestos. In older homes, have suspect materials such as textured ceiling coatings, old floor tiles or boarding checked before demolition starts.
- Divert services. Sockets, switches, cables, pipes and radiators in the wall need to be moved by an electrician or plumber before demolition.
- Prop the structure. Adjustable steel props and, where needed, horizontal “needles” through the wall above, temporarily carry the floor and walls while the wall is removed.
- Remove the wall. The wall is taken down in a controlled way, with dust screens protecting the rest of the house.
- Install padstones and the beam. Concrete padstones are set at each end, the beam is lifted into place, levelled and tightly packed so it takes the load.
- Remove the props. Once packing and any mortar have gained strength, the props come out and the engineer inspects.
- Fire protection and making good. The beam is boxed or coated, then the ceiling, walls and floor are repaired where the wall stood. Floors often need the most work, especially where two different floor levels or finishes now meet.
The structural part is often completed in a few days. Making good, electrics, plastering, flooring and decorating usually take longer than removing the wall itself.
Semi-Detached and Terraced Houses: Party Walls
If the beam needs to bear onto the party wall shared with your neighbour, the engineer must check that the party wall can take the load, and the work must be carried out without damaging the neighbouring property. In Ireland, works to a party wall are covered by the Land and Conveyancing Law Reform Act 2009, which generally requires your neighbour’s consent, and that consent cannot be unreasonably withheld. Tell your neighbour early, agree the works in writing and record the condition of their adjoining walls before work starts. Take legal advice if there is any disagreement over the shared wall.
Open-Plan Living and Fire Safety
Removing a wall can change how the house performs in a fire. In a two-storey house, the wall between the kitchen or living room and the hall often forms part of the protected route from the upstairs bedrooms down the stairs and out of the front door. Opening that wall can remove the protection. Before removing a hallway wall, ask your designer to check Part B of the Building Regulations. The answer may involve escape windows upstairs, upgraded smoke and heat alarms, or keeping a door or partition between the stairs and the new open-plan room.
Open-plan rooms can also be harder to heat. A single large space may need extra radiator output or underfloor heating to stay comfortable, which is worth planning alongside the structural work.
What It Costs to Remove a Load-Bearing Wall in Ireland
Costs depend on the span, the load above, the type of beam, whether it is flush or downstand, and how much making good is needed. As a guide:
| Item | Typical cost |
|---|---|
| Structural engineer: inspection, design and certification | €500 to €2,000 |
| Full load-bearing wall removal: demolition, beam, padstones, rerouting services and finishing | Around €12,000 to €15,000, excluding the engineer |
Engineer fees from our house extension cost guide. The overall range is an Irish estimate published by onlinetradesmen.ie and varies widely with the job.
Factors that push the cost up include:
- a flush beam rather than a downstand beam;
- long spans, heavy loads such as a wall or chimney above, or a wall on an upper floor;
- new foundations or pad footings under the beam supports;
- bearing onto a party wall;
- asbestos removal;
- relocating a kitchen, radiators or a consumer unit;
- joining two different floor finishes or levels, or fitting a new floor throughout.
Removing a non-load-bearing stud partition costs much less, as it needs no beam or temporary support.
Planning Permission and Building Regulations
- Planning permission: internal works that do not materially affect the external appearance of the house are generally exempted development, so removing an internal wall does not usually need planning permission. The exception is a protected structure, where internal works that affect its character need permission or a declaration from the planning authority.
- Building Regulations: structural alterations must comply with the Building Regulations, in particular Part A (structure) and Part B (fire safety). Responsibility for compliance rests with the owner, designer and builder, which is why the engineer’s design, inspections and certificate matter.
If the opening is part of a wider project, such as knocking through into a new rear extension, the same principles apply. Our guides to planning permission for house extensions and timber frame vs block extensions cover the extension side.
Load-Bearing Wall Removal FAQs
Can I remove a load-bearing wall in my house?
Usually yes, provided a structural engineer designs a suitable beam and supports, the work is carried out with proper temporary propping, and the result complies with the Building Regulations. Some walls, such as those carrying heavy loads or chimneys, can be more complex or costly to remove.
Do I need planning permission to remove an internal wall in Ireland?
Not usually, as internal works that do not affect the external appearance are generally exempt. Protected structures are the main exception.
How much does it cost to remove a load-bearing wall in Ireland?
A typical full job is around €12,000 to €15,000 plus €500 to €2,000 for the structural engineer, but simple openings can cost less and complex ones considerably more.
How long does it take?
The structural work, from propping to installing the beam, often takes a few days. Allow longer for diverting services, making good, plastering, flooring and decorating.
Can I stay in the house while the wall is removed?
Often yes, although the affected rooms will be out of use, and there will be dust and noise. Your builder should screen off the work area and keep a safe route through the house.
Is a steel beam or a timber beam better?
Steel is more common for heavier loads and longer spans because it is shallower for the same strength. Engineered timber can suit lighter loads and is easier to handle. The engineer will specify what suits the loads in your house.
Planning an Open-Plan Layout?
OS Holding carries out structural alterations as part of house renovations across Dublin and surrounding areas, working with structural engineers from design through to certification, and finishing the space so it is ready to use.
Contact us to arrange a site survey, or read about our house renovation service.