Banner
Banner

Wet Room Installation Dublin

bathroom REFURBISHMENT

Wet Room Installation in Dublin

OS Holding designs and installs wet rooms for homes across Dublin and surrounding areas. Whether you are replacing a bath, improving access or creating a cleaner contemporary bathroom layout, our team can coordinate the building work, waterproofing, drainage, tiling, plumbing and finishing.

A successful wet room depends on details that are mostly hidden after completion. Floor falls, drainage capacity, waterproofing, wall and floor backgrounds, junctions and ventilation must be considered together. We begin with a site survey so the proposed layout and installation method are based on the property rather than a generic package.

Wet Room Design and Installation

A wet room is a bathroom or shower area designed so water can drain safely from a level or near-level floor. Unlike a conventional enclosure that relies on a raised shower tray, the shower area forms part of the room’s waterproofed floor construction.

Some wet rooms use a fixed glass screen to control splashing, while others are more open. The right arrangement depends on room size, door position, sanitary ware, drainage, heating, ventilation and how the space will be used.

OS Holding provides wet room design and installation as a coordinated renovation service. We assess the existing bathroom, discuss the preferred layout and prepare a quotation for the work required.

Wet Room or Walk-In Shower?

The terms are often used interchangeably, but they do not always describe the same construction. A walk-in shower may use a low-profile tray with an open entrance and glass screen. A wet room normally relies on a waterproofed floor area formed to direct water to a drain.

Both approaches can create easier access and a more open appearance than a traditional enclosed shower. The choice depends on the available floor build-up, drainage route, room size, splash control and the condition of the existing structure.

During the survey we explain what is practical for the property. Where a full wet-room floor is not suitable, a carefully selected low-profile walk-in shower may meet the design objectives with a different construction approach.

Bath-to-Wet-Room and Walk-In-Shower Conversions

Replacing a bath with a walk-in shower or wet-room area can make the bathroom easier to enter and free up visual space. It can also provide an opportunity to renew old plumbing, wall finishes, flooring, ventilation and sanitary ware as part of one planned project.

A bath-to-shower conversion is not simply a matter of removing the bath and fitting a screen. The project may involve:

  • Removing the existing bath and surrounding finishes
  • Inspecting walls, floor and concealed plumbing
  • Repositioning or upgrading water and waste connections
  • Forming the required falls to the shower drain
  • Installing a suitable waterproofing system
  • Rebuilding wall and floor finishes
  • Coordinating the screen, controls and sanitary fittings
  • Updating ventilation, heating or lighting where included

OS Holding can undertake this work as part of a complete bathroom renovation in Dublin. The final scope is confirmed after the existing bathroom and proposed layout have been surveyed.

For a complete room upgrade alongside a bath-to-shower conversion, explore our bathroom renovation service in Bayside.

Wet Rooms for Small Bathrooms

A wet-room layout can help a small bathroom feel less divided because there is no bulky enclosed cubicle. However, removing the enclosure does not remove the need to control water. The shower position, screen size, door swing, storage and sanitary ware all need to be planned around the available dimensions.

In a compact room, the design should reduce unnecessary splashing and keep towels, toilet paper, cabinetry and electrical fittings away from the main wet zone. A fixed screen may preserve the open appearance while protecting the rest of the bathroom.

We measure the room and discuss practical circulation before proposing a layout. Small wet-room ideas seen online may not suit every drainage route or floor construction, so the property survey remains essential.

Accessible and Future-Friendly Wet Rooms

A level or near-level shower entrance can be useful for households planning around reduced mobility or future needs. The layout can also consider clear circulation, the position of controls, suitable support locations and slip-resistant surface options.

Accessibility is specific to the user and property. We discuss the intended use and coordinate the agreed features, but specialist occupational-therapy advice may be appropriate where the room must respond to particular mobility or care requirements.

Waterproofing a Wet Room

Waterproofing is central to the installation. Tiles and grout form the visible finish, but they should not be treated as the sole waterproof barrier. The selected system must address the floor, walls in relevant wet areas, corners, junctions, pipe penetrations and the connection to the drain.

The background needs to be sound and suitable before waterproofing begins. Loose finishes, damaged boards, movement, unevenness or moisture-related problems may require additional preparation or replacement.

The waterproofing method is confirmed for the specific project and installed as part of the agreed build-up before the tiled finishes are completed.

Drainage and Floor Falls

A wet-room floor must guide water towards the drain without creating unwanted pooling. The available floor depth, joist or slab construction, waste route and drain position all affect how the falls can be formed.

Drainage changes may require opening parts of the floor and coordinating plumbing with the structural build-up. We inspect the existing construction before confirming whether a central drain, linear drain or another arrangement is appropriate.

For more information on tiled floor preparation and installation, see our floor tiling service in Dublin.

Wet Room Wall and Floor Finishes

Porcelain, ceramic, mosaic and suitable natural-stone products can be considered for wet-room surfaces. The final selection should account for its intended location, maintenance, grout joints, surface texture and compatibility with the installation system.

Smaller floor tiles can make it easier to follow falls around certain drain arrangements, while larger formats may be possible with suitable design and cutting. Wall format, grout alignment, niches, screens and sanitary fittings should be set out before fixing begins.

Natural stone may require specialist sealing and care. Every tile should be checked for suitability rather than selected only by appearance.

Ventilation, Heating and Lighting

Good ventilation helps manage moisture after the shower has been used. The existing fan, duct route and room conditions are reviewed so any required improvement can be included in the project scope.

Heating can improve comfort and help surfaces dry, but it must be coordinated with the floor and waterproofing build-up. Lighting and electrical work should also be planned around the wet-room layout and completed by the relevant qualified trades where included.

What Our Wet Room Installation Can Include

Each project is surveyed and quoted individually. Depending on the property and agreed specification, our wet room installation service can include:

  • Free, no-obligation site survey
  • Layout planning and measurement
  • Removal of existing bathroom fittings and finishes
  • Plumbing and drainage alterations included in the quotation
  • Floor and wall preparation
  • Wet-room waterproofing system
  • Drain and shower-area formation
  • Wall tiling and floor tiling
  • Installation of agreed sanitary ware, controls and screens
  • Electrical, ventilation and heating coordination where included
  • Decorating and final finishing identified in the scope
  • Inspection and project handover

The quotation identifies what is included, what the client will supply and any provisional work that depends on opening the existing construction.

What Affects Wet Room Cost?

Wet room cost in Ireland varies because the work depends heavily on the existing bathroom and floor structure. A quotation may be influenced by:

  • Room size and proposed layout
  • Existing floor construction and available build-up
  • Drain location and waste-pipe route
  • Condition of walls, floor and concealed services
  • Amount of demolition and repair required
  • Waterproofing and preparation system
  • Tile material, format and layout complexity
  • Sanitary ware, screen, fittings and storage choices
  • Ventilation, heating, lighting and electrical changes
  • Access and coordination with other renovation work

We do not rely on a one-size-fits-all price. The site survey allows us to inspect the property and prepare a quotation for the agreed design and installation scope. For wider budgeting context, read our guide to bathroom renovation costs.

How Long Does Wet Room Installation Take?

The programme depends on demolition, drainage alterations, preparation, waterproofing, tiling, drying times and the other fittings included. A bath-to-shower conversion with limited changes may differ significantly from a complete wet-room rebuild.

We provide a project sequence after the survey and specification are agreed. Our guide to bathroom renovation timescales in Dublin explains the main stages that influence a bathroom programme.

Why Choose OS Holding for a Wet Room?

  • One team to coordinate building, plumbing, waterproofing, tiling and finishing
  • Free site survey and project-specific quotation
  • Experience delivering complete bathroom renovations
  • Careful assessment of floor build-up, drainage and backgrounds
  • Layout planning around access, splash control and daily use
  • Clear scope and communication throughout the project
  • Dedicated project management for coordinated renovation work
  • Fully insured building and renovation contractor

Our Wet Room Installation Process

1. Site Survey

We measure the bathroom, inspect the visible floor and walls, review drainage options and discuss how the room needs to work.

2. Design and Quotation

We agree the proposed layout, finishes and project scope. The quotation identifies the preparation, services, installation and finishing work included.

3. Removal and Preparation

The existing fittings and finishes are removed as agreed. The background is inspected, repaired and prepared for the new wet-room build-up.

4. Drainage and Waterproofing

The shower falls, drain and waterproofing system are installed in accordance with the agreed design and compatible installation requirements.

5. Tiling and Fit-Out

Wall and floor finishes are installed, followed by the agreed sanitary ware, shower controls, screen, storage and accessories.

6. Inspection and Handover

We inspect the completed work against the agreed scope and provide relevant care information for the wet-room finishes.

Wet Room Installers Serving Dublin

OS Holding installs wet rooms and walk-in shower conversions across Dublin and surrounding areas. Arrange a site survey to discuss the room, access requirements, preferred finish and the practical installation options for your property.

Recent Bathroom and Wet-Room-Style Projects

Browse a selection of bathroom, shower, tiling and renovation work completed by OS Holding in our project gallery.

Wet Room Installation FAQs

A wet room is a bathroom or shower area designed with a waterproofed floor construction that directs water towards a drain. It may be fully open or use a glass screen to control splashing.

A walk-in shower can use a low-profile tray with an open entrance. A wet room generally forms the shower falls and drainage within a waterproofed floor area. The best option depends on the property and desired layout.

Yes, where the layout, drainage and floor construction are suitable. We survey the bathroom and confirm the removal, plumbing, preparation, waterproofing, tiling and fitting work required.

It may be possible, but the floor structure, movement, build-up, drainage route and waterproofing details must be assessed first. We inspect the property before recommending an installation approach.

A compatible waterproofing system is applied to the prepared floor and relevant wall areas, including corners, junctions, penetrations and the drain connection. Tiles and grout are the visible finish, not the sole waterproof barrier.

Often, subject to the room dimensions, drainage, floor construction and splash-control requirements. A compact room may benefit from a fixed screen and carefully positioned sanitary ware.

The programme depends on demolition, drainage changes, preparation, waterproofing, drying times, tiling and fit-out. We provide a project sequence after surveying the bathroom and agreeing the specification.

Cost depends on room size, floor construction, drainage, waterproofing, tile choice, sanitary ware and the amount of preparation required. We provide a project-specific quotation after a site survey.

Ready to Plan Your Wet Room?

Arrange a free, no-obligation site survey with OS Holding. We will inspect the bathroom, discuss the proposed layout and prepare a quotation for the drainage, waterproofing, tiling and fit-out work required.

icon

Our Commitment to Your Wet Room Project

Our team coordinates drainage, waterproofing, tiling, plumbing and finishing with clear communication throughout the agreed project.

Request a Wet Room Quote