Renovating a whole house means coordinating trades that have to follow each other in the right order. We handle the entire project for homeowners across Lucan under one contract, one schedule and one point of contact.
Most Lucan housing was built between the late 1970s and the 2000s. These are not houses that need rescuing: the structure is sound and the services are broadly current. What dates them is everything you touch and look at.
Most Lucan housing was built between the late 1970s and the 2000s, and that matters for what a renovation here actually involves. These are not houses that need rescuing. The structure is sound, the wiring and plumbing were installed to standards that are still broadly current, and the roof is doing its job.
What dates them is everything you touch and look at: the kitchen, the bathrooms, the flooring, the internal doors, and a layout that reflects how houses were designed to be lived in twenty-five years ago rather than now.
In practice a full Lucan renovation is a kitchen, one or two bathrooms, flooring throughout, decoration, and frequently a structural opening between the kitchen and the room next door.
What it usually is not is a full rewire or replumb. In housing of this age those are rarely necessary, and anyone quoting for them as standard is worth questioning. We check rather than assume, and where the answer is that your existing installation is fine, we will tell you.
That is the main difference between renovating in Lucan and renovating in inner Dublin, and it is why the budget goes further here.
The advantage of doing the whole house together is that trades overlap efficiently, you live through the disruption once, and the finishes actually match. The disadvantage is that it costs more in one go and you probably cannot stay in the house comfortably while it happens.
Staging the work over a couple of years is entirely reasonable and a lot of Lucan families do it. What matters is deciding the sequence at the start, so that later phases do not undo earlier ones. Flooring, in particular, should come after any structural work rather than before.
A whole-house project in Lucan is usually made up of these, and each has its own page with what is specific to the area:
Where insulation forms part of the work, our home insulation page covers the options.
The reason people bring a whole-house renovation to a single contractor is coordination. Trades that follow each other correctly, one person accountable for the schedule, and no gaps where each trade is waiting on another they never spoke to.
You get a dedicated project manager for the duration, one fixed written quotation covering the whole scope, and one point of contact rather than six numbers in your phone.
Every renovation is different because every homeowner has different priorities.
Some clients want to modernise an older property while preserving its character. Others are looking to create open-plan living spaces, update kitchens and bathrooms or combine a renovation with an extension or attic conversion.
We invite you to browse our portfolio of completed renovation projects to see examples of our workmanship and the range of residential projects we’ve completed. Viewing previous work can help you gather ideas and understand what’s possible for your own home.
Usually not. In housing built from the late 1970s onwards the electrical installation is generally to standards that are still broadly current, and a full rewire is rarely necessary. Anyone quoting for one as standard is worth questioning. We check rather than assume, and where your existing installation is fine we will say so.
Doing it together means trades overlap efficiently, you live through the disruption once and the finishes match. Staging it over a couple of years is entirely reasonable and many Lucan families do. What matters is deciding the sequence at the start so later phases do not undo earlier ones.
For a staged renovation, usually yes. For a full whole-house project, generally not comfortably, particularly once the kitchen and bathrooms are out at the same time. We are straight about this at survey rather than optimistic about it.
Structural work first, then services where they are being altered, then plastering, then second fix, then flooring and decoration last. Flooring in particular should come after structural work rather than before, which is the most common sequencing mistake we are asked to correct.
The survey costs nothing and carries no obligation. We walk the house, establish what genuinely needs doing and what does not, and give you a fixed written quotation covering the full scope rather than an estimate that grows.
If you are buying rather than already living there, the survey is worth doing before you close so the renovation budget is a known number.
We renovate homes throughout Lucan and west Dublin, including Adamstown, Palmerstown, Clondalkin, Leixlip and Celbridge.
As a top building contractor, our team of expert tradesmen and managers is dedicated to ensuring the seamless completion of your project. Particularly, we will guide you through the process and ensure transparency to help you make informed decisions.