Ireland is paying for building defects from three different eras at once: crumbling concrete blocks in the north west and mid west, pyrite under the floor slabs of Celtic Tiger era homes in north Dublin and Meath, and fire safety, structural and water ingress defects in apartments built between 1991 and 2013. On top of that, home building and improvement work is one of the most common reasons consumers contact the State’s consumer watchdog. This page gathers the current Irish figures on building defects, remediation schemes and builder complaints, each linked to its primary source. It is part of a series with our damp, mould and radon statistics, period and older homes statistics and building and renovation cost statistics.

Key Building Defects Statistics for Ireland at a Glance

  • 3,764 applications had been made to the defective concrete blocks grant schemes by the end of August 2026, and 2,856 of them, 75.9%, came from Donegal (calculated). Source: Department of Housing, defective concrete block statistics to August 2026
  • Remediation had been completed on 604 homes, about one in six applications (calculated), and works had started on 1,398. Source: Department of Housing
  • €395 million had been spent on the defective concrete blocks grant scheme since June 2020. Source: Department of Housing
  • Research presented to the Oireachtas in June 2026 suggested up to 20,000 homes could have been built with defective blocks, more than double the 9,500 estimated by local authority managers earlier in the year. Source: RTÉ News, June 2026
  • The maximum grant under the defective concrete blocks scheme is €462,000 per home. Source: gov.ie, Defective Concrete Blocks Grant Scheme
  • 2,851 homes had been remediated for pyrite under ground floor slabs by the end of 2024, at a cost of about €196 million, with the majority in Fingal. Source: Department of Housing, February 2026
  • The Pyrite Remediation Scheme closes to applications on 30 November 2026. Source: Pyrite Resolution Board
  • Between 50% and 80% of apartments and duplexes built between 1991 and 2013 may have fire safety, structural safety or water ingress defects, equal to 62,500 to 100,000 homes. Source: Oireachtas Housing Committee, January 2026
  • Remediating those apartments could cost the State between €1.5 billion and €2.5 billion, based on an average of about €25,000 per unit. Source: Oireachtas Housing Committee
  • 2,838 consumers contacted the CCPC about home building or improvements in 2025, up 12% on 2024, and they had spent an average of €14,597 on work they later had problems with. Source: CCPC consumer helpline report 2025
Infographic of building defects statistics for Ireland in 2026, showing defective concrete block applications, completed remediations and spend, the estimate of homes with defective blocks, pyrite remediations and the scheme closing date, the estimated number and cost of defective apartments, and CCPC complaints about home building work
Free to embed. Please credit OS Holding with a link to this page: https://osholding.ie/building-defects-statistics-ireland/

Defective Concrete Blocks: Applications, Works and Spend

Defective concrete blocks contain excessive amounts of mica or pyrite, which causes the blockwork to crack and break down over time. The Department of Housing publishes monthly figures on the grant scheme for affected homeowners, and the latest release covers the position to 31 August 2026. Across the five counties it reports on, 3,764 homeowners had applied under the previous scheme or the current enhanced scheme, which began on 22 June 2023. Donegal accounts for three quarters of every application, with Mayo a distant second.

County Applications (both schemes) Works commenced Works completed
Donegal 2,856 1,071 434
Mayo 525 277 166
Clare 269 45 4
Limerick 100 5 0
Sligo 14 0 0
Total 3,764 1,398 604

Source: Department of Housing, statistics for the Defective Concrete Block Scheme to the end of August 2026, published 18 September 2026.

The pipeline is long. Of the 3,764 applicants, 1,594 had submitted remedial works plans, 1,398 had started work and 604 had finished, so 16.0% of applications had reached completion (calculated). The Housing Agency had determined a remedial option or grant for 1,038 applications under the current scheme, and local authorities had determined a further 980 transitional applications. Only 133 homeowners had been issued letters of assurance. Total spend on the scheme since June 2020 stood at €395 million, per the same release.

How Many Homes Have Defective Blocks

No one knows the final number, and the estimates have grown each time they are revisited. Early in 2026 the County and City Management Association told the Oireachtas Housing Committee that about 9,500 homes were affected: 6,500 in Donegal, 1,100 in Mayo, 860 in Clare, 700 in Limerick and at least 300 in Sligo, as reported by RTÉ News. In June 2026, research by the mineralogical consultancy Petrolab, presented to TDs and senators, suggested the number of high risk homes could rise to 12,000 in Donegal, 4,500 in Clare, 2,500 in Limerick and 1,000 in Mayo, a total of 20,000. That estimate is based on testing in 48 private estates and excludes social housing and commercial buildings, so the researchers suggested it could rise further.

County Local authority estimate, early 2026 Petrolab estimate, June 2026
Donegal 6,500 12,000
Clare 860 4,500
Limerick 700 2,500
Mayo 1,100 1,000
Sligo At least 300 Not estimated
Total About 9,500 About 20,000

Source: RTÉ News, 23 June 2026. Both sets of figures are estimates, and the Petrolab figures have not been adopted by the Department of Housing.

The Defective Blocks Grant: Cap, Counties and Budget

The enhanced grant scheme offers five remedial options, up to full demolition and reconstruction of the home, subject to an overall cap of €462,000 per home, and pays 100% of the approved grant or the actual vouched cost, whichever is less, according to gov.ie. The scheme was originally limited to Clare, Donegal, Limerick, Mayo and Sligo. The scheme page, last updated on 2 September 2026, now lists nine areas: Carlow, Clare, Donegal, Limerick, Mayo and Sligo, plus parts of Fingal, Meath and Wexford. That brings part of County Dublin inside the scheme.

Spending has accelerated sharply. The Department of Housing told the Oireachtas Housing Committee in February 2026 that more than €155 million was spent in 2025, against just under €60 million in 2024, about 2.6 times as much (calculated), and that €175 million had been provided for 2026, as reported by the Irish Times. The initial cost estimate for the scheme in 2021 was €2.2 billion.

Pyrite Under Floor Slabs: 2,851 Homes Remediated

Pyrite is a separate problem from defective blocks. Here the damage comes from pyritic heave in the stone hardcore placed under ground floor slabs, which swells and cracks floors and internal walls. The Pyrite Remediation Scheme was set up in 2014, and by the end of 2024 a total of 2,851 homes had been remediated at a cost of about €196 million, spread across nine local authority areas with the majority in Fingal, according to the Department of Housing. That works out at about €68,700 per home (calculated).

The scheme is now winding down. Applications have fallen to an average of about two a week, roughly 100 a year, and the Pyrite Resolution Board recommended a planned close. In February 2026 eligibility was widened to homes with a Damage Condition Rating of 1 that show progression, adding an estimated 200 homes, alongside the existing rating of 2 for significant damage. The Pyrite Resolution Board will close the scheme to applications on 30 November 2026. Homeowners need an engineer to carry out a building condition assessment before they can apply online.

Apartment and Duplex Defects Built 1991 to 2013

The largest defect problem by number of homes is in apartments and duplexes. The Working Group to Examine Defects in Housing estimated that between 50% and 80% of apartments and duplexes, or their common areas, built between 1991 and 2013 may be affected by one or more fire safety, structural safety or water ingress defects. That is between 62,500 and 100,000 homes, according to the Oireachtas Housing Committee report of January 2026. The average cost of remediation was put at about €25,000 per unit, giving a potential cost to the Exchequer of €1.5 billion to €2.5 billion, excluding inflation.

The statutory scheme to pay for this work is not yet in place. The committee completed pre-legislative scrutiny of the General Scheme of the Apartment and Duplex Defects Remediation Bill in January 2026, and in May 2026 the Department of Housing said the bill was being drafted and that the scheme would be in place later in the year, subject to the legislative process, as reported by RTÉ News. When we checked the Oireachtas bills database on 20 October 2026, the bill had not yet been introduced. The general scheme provides for retrospective payment of eligible costs already incurred, but excludes wear and tear, poor maintenance and end of life safety systems.

Most of those apartments are now 16 to 35 years old: 66.6% of the purpose-built apartments counted at Census 2022 were built between 1991 and 2010. See our apartment statistics for Ireland.

The Interim Fire Safety Scheme

While the main scheme is awaited, an Interim Remediation Scheme funds emergency fire safety works in apartments and duplexes built between 1991 and 2013. Only owners’ management companies can apply, and no money is paid to individual owners. The scheme opened on 11 December 2023, and by the end of November 2025 the Housing Agency had received 393 applications and validated 229 of them, 58.3% (calculated). Four pathfinder projects had progressed, and one grant agreement had been signed, according to the Oireachtas Housing Committee. The same report notes that an estimated 25% of multi-unit developments have not had their common areas transferred to the owners’ management company, which is a condition of applying.

Complaints About Builders and Home Improvement Work

Defects are not only a legacy problem. The Competition and Consumer Protection Commission’s helpline received 2,838 contacts about home building or improvements in 2025, an increase of 12% on 2024. Consumers reported spending an average of €14,597 on work they later found issues with, according to the CCPC consumer helpline report 2025, published in April 2026. Home building made up 6.6% of the 42,791 consumers who contacted the helpline that year (calculated).

In the first half of 2025 alone there were almost 1,250 contacts about the sector, making it the second biggest reason people called the helpline. The most common complaints were traders refusing to fix problems, long waits for work to start after a start date had been agreed, and traders not turning up to fix reported issues. In November 2025 the CCPC wrote directly to almost 3,000 traders to remind them of their duties under the Consumer Rights Act 2022, according to its press release of 3 November 2025. Under that Act, a trader must give the total price including VAT before the contract, deliver the service that was agreed, and offer a remedy when the work falls short.

The money at stake keeps growing: Irish households spent over €7.5 billion on home improvements in 2024, almost double the 2019 level, according to CSO data reported by BPFI. See our home improvement spending statistics for Ireland.

Builder Registration: Where the CIRI Register Stands

Ireland still has no mandatory register of builders. The Regulation of Providers of Building Works Act 2022 was signed into law on 5 July 2022 to put the Construction Industry Register Ireland on a statutory footing, and the Construction Industry Federation was appointed as the registration body on 16 January 2023. The old voluntary register has been renamed the Voluntary Construction Register, and ciri.ie now says it is envisaged that registration on the statutory register will become mandatory for builders from 2027.

The gap is large. The Department of Housing estimated that about 500 building and contracting entities were on the voluntary register, against an estimated 20,000 construction firms that will need to register once it is mandatory, as reported by the Irish Examiner in February 2026. That is about 2.5% (calculated). The first divisions to open are expected to cover providers of apartments, duplexes and housing developments of ten or more homes, with each division given 12 months to register.

What the Figures Mean for Homeowners Planning Work

For anyone buying or renovating, the figures point to a few practical checks. A home in an affected estate in Fingal, Meath or the counties covered by the blocks scheme should be assessed by an engineer before major renovation work starts, because the pyrite scheme requires an engineer’s building condition assessment and defective block grants are set by a Housing Agency assessment of the damage. Pyrite applications must be in by 30 November 2026. For apartments and duplexes built between 1991 and 2013, the owners’ management company is the route to any interim fire safety funding. For ordinary building and renovation work, the CCPC’s guidance on home improvement disputes advises getting a written quote rather than an estimate, signing a contract, and checking references and previous jobs. Our guide to finding a reliable builder covers the same ground for Dublin projects.

Method and Sources

Every figure was taken from the named source on 20 October 2026: the Department of Housing statistics for the Defective Concrete Block Scheme to the end of August 2026, published 18 September 2026; the gov.ie Defective Concrete Blocks Grant Scheme page, last updated 2 September 2026; the Department of Housing press release of 11 February 2026 on the Pyrite Remediation Scheme; the Pyrite Resolution Board website; the Oireachtas Joint Committee on Housing, Local Government and Heritage report on the pre-legislative scrutiny of the General Scheme of the Apartment and Duplex Defects Remediation Bill 2024, published 29 January 2026; the gov.ie page for the Interim Remediation Scheme; the Oireachtas bills database; the CCPC consumer helpline report 2025 and CCPC press release of 3 November 2025; and ciri.ie. Figures given at Oireachtas committees, and the Petrolab research, are cited as reported by RTÉ News, the Irish Times and the Irish Examiner, and will be replaced with primary documents where these are published. Figures marked calculated were derived by OS Holding from the cited sources, specifically the Donegal share and completion rate for defective blocks, the growth in annual spend, the average pyrite remediation cost, the interim scheme validation rate, the home building share of CCPC contacts and the share of firms on the voluntary register. The page will be refreshed with each monthly defective blocks release, when the pyrite scheme closes, when the apartment defects bill is published and when the CCPC publishes its 2026 helpline report.

How OS Holding Helps

OS Holding is a Dublin building contractor carrying out house renovations, extensions and structural alterations, with every job priced in a written, itemised quote before work starts. If you are planning work on a home with cracking, movement or a history of defects, we can work alongside your engineer on the repairs and the renovation together. For a written quote, request a quote or contact the team. Journalists and researchers are welcome to quote any figure here with a link to the source and to this page.